Addition & Renovation - Ottsville PA
 |  |  |
---|
 |  |  |
---|
 |  |  Almost ready for roofing. |
---|
 |  |  |
---|
 Beautiful framing. |  Framing the interior of the addition. |  Taking apart the interior of the upstairs of current home to get ready for everything to be new! |
---|
 |  First floor deck is complete. |  Finishing up the foundation membrane system. |
---|
 |  Engineered floor system |  |
---|
 Concrete crawl space floor. |  Walls are insulated |  Waterproof membrane system installed |
---|
 Dustin from Souder Masonry setting block for a strong foundation. |  Form work for level footings. |  Perfect forms for perfect footings. |
---|
 |  |  |
---|
 |  Temporary construction driveway so we can bring the big equipment in. |  |
---|
 Before renovation |
---|